These five projects have construction underway: three in Alberta, one in Saskatchewan and one in Kamloops. At AHI in Alberta, construction covers the first 10 MW phase of power generation. Meta expects about 3,000 construction workers on site at peak construction in Sturgeon County.

Sources4356789101121

The project site says career opportunities will be posted through the participating companies’ career pages. Meta points job seekers to its general contractor, Frost Collective, for construction information and job opportunities. Typical data centre trades include electricians, pipefitters and refrigeration mechanics.

Find job postings

Frost Collective is the general contractor for Meta’s project. It is a joint venture of Clark Builders and PCL Construction. Stantec and SLB are also on the delivery team.

Sources231

Werko postings

Werko does not track job postings for data centre projects in Canada yet.

Data centre projects with construction underway

ProjectStatus
Meta’s Sturgeon Data Centre, a 1 GW data centre in Sturgeon County, Alberta[4][12]Meta’s data centre in Sturgeon County, Alberta, is under construction[4][3][5]
Bell AI Fabric data centre, Rural Municipality of Sherwood, in the Regina area of Saskatchewan[6][13]Bell Canada’s initial 300 MW project in the RM of Sherwood is under construction[6]
AHI AI Hub of Innovation, Blindman Industrial Park, Red Deer County, Alberta[8][7]The first 10 MW generation phase is under construction and commissioning[7][8]
eStruxture CAL-3, a data centre in east Balzac, Rocky View County, Alberta[14][9]Under construction[9][10]
Data centre at 1452 McGill Road, Kamloops, British Columbia, part of Bell AI Fabric[11]Construction was underway by April 9, 2026[11]

How many workers these builds need

Three construction workforce estimates, from three sources.

  • Meta, at peak construction: Meta expects about 3,000 construction workers on site.

  • Bell’s initial project, throughout construction: the Government of Saskatchewan expects more than 800 local jobs across trades.

  • Greenlight, at peak construction: Greenlight expects more than 1,000 workers.

  • Greenlight, work hours: Greenlight expects nearly 4.5 million hours of work.

Greenlight is the gas-fired plant being built to supply the Meta data centre.

Sources211516

Typical data centre trades

TradeTypical work for this project type
Construction ElectricianPower distribution, backup power, and lighting make electrical work a major share of the build.
Industrial ElectricianSwitchgear, generators, and industrial controls need industrial electricians.
Steamfitter/PipefitterChilled water and liquid cooling systems need pipefitters.
Refrigeration and Air Conditioning MechanicChillers and precision cooling units need refrigeration mechanics.
Sheet Metal WorkerAir handling systems and ductwork need sheet metal workers.
PlumberDomestic water, drainage, and process water systems need plumbers.
Ironworker (Structural/Ornamental)Large building frames use structural steel that ironworkers erect.
Mobile Crane OperatorStructural steel, generators, and cooling equipment need crane lifts.
Concrete FinisherLarge floor slabs and equipment pads need concrete finishing.
Sprinkler FitterLarge buildings need fire sprinkler systems installed throughout.
Insulator (Heat and Frost)Insulates thermal piping and equipment.
Powerline TechnicianHigh-load sites often need new substations and power lines built by powerline technicians.

These trades are typical for a data centre build. They are not jobs posted by any one project.

Trades Alberta names on the Meta project

  • The Government of Alberta says Frost Collective employs Alberta electricians, pipefitters, crane operators and engineers on the project.[5]

Pay in Alberta and Saskatchewan

Hourly · Data from 2023 to 2024 · Dated November 19, 2025

TradeLowMedianHigh
Construction Electrician, Alberta$21.50[17]$38.00[17]$46.00[17]
Refrigeration And Air Conditioning Mechanic, Alberta$25.00[18]$40.00[18]$54.00[18]
Construction Electrician, Saskatchewan$19.00[19]$37.50[19]$48.00[19]
Refrigeration And Air Conditioning Mechanic, Saskatchewan$28.50[20]$40.00[20]$59.00[20]

Tickets in Alberta and Saskatchewan

To do restricted work in the Alberta compulsory trades listed below, you need one of these:

  • A registered apprenticeship, working under a certified journeyperson.

  • A journeyperson certificate.

  • A recognized trade certificate.

These Alberta compulsory trades include:

  • Electrician

  • Refrigeration and Air Conditioning Mechanic

  • Sheet Metal Worker

  • Steamfitter-Pipefitter

  • Plumber

  • Crane and Hoisting Equipment Operator: Mobile Crane and Tower Crane branches

In Saskatchewan’s compulsory apprenticeship trades listed below, you must be a registered apprentice or a certified journeyperson. If you are not certified, you must register within six months (900 hours) of starting work in the trade.

Saskatchewan’s compulsory apprenticeship trades are:

  • Construction Electrician

  • Plumber

  • Refrigeration and Air Conditioning Mechanic

  • Sheet Metal Worker

  • Sprinkler Fitter

Sources2122

Power supply and grid connections

Data centres need a lot of power, and grid space for them is limited. Alberta’s first temporary limit allows large power users to connect 1,200 MW to the grid. The grid operator has assigned all of it. Other large users enter a second phase.

Meta’s campus combines a 970 MW grid connection with its own power supply from Greenlight. Greenlight is a separate 932 MW gas-fired plant in Sturgeon County.

The Alberta Utilities Commission approved Greenlight on June 19, 2026. The commission decides power plant applications; it does not approve or regulate data centres. Aecon and Técnicas Reunidas hold Greenlight’s engineering, procurement and construction contract.

In Saskatchewan, a company proposing a new data centre must supply its own power. The first phase of Bell’s transmission connection is expected to be finished by the end of 2026.

Sources23245121625262761315

Data centres still being planned

ProjectStatus
A 390 MW data centre and a 190 MW gas-fired generation facility in the Spruce Lake Industrial Park, Saint John, New Brunswick[28]Provincial environmental impact assessment review in progress[28]
TransAlta’s Keephills site, Parkland County, Alberta[29]Early planning. TransAlta says a new data centre is not being built at this time[30]
Beacon Heartland Data Centre, proposed in Alberta’s Industrial Heartland[12]In development and planning, with no final investment decision yet[24][12]
TELUS Sovereign AI Factory cluster in Kamloops and Vancouver[31]Proposed three-site cluster. The federal government had not committed funding for it as of May 11, 2026[32][31]

Indigenous agreements and engagement

  • Bell Canada signed an agreement with George Gordon First Nation focused on Indigenous participation and workforce development.[6][15]

  • The Sturgeon Data Centre project team says it is committed to working with Indigenous communities, organizations and businesses. That includes workforce participation and training.[1]

Sources

  1. Sturgeon Data Centre (Meta project site)

    Retrieved September 16, 2026

  2. Hello, Sturgeon County!

    Meta. Retrieved September 16, 2026

  3. Meta Data Centre

    Government of Alberta (Alberta Major Projects). Retrieved September 16, 2026

  4. Meta

    Retrieved September 16, 2026

  5. Havenz Corp

    Retrieved September 16, 2026

  6. Blindman Industrial Park AI Data Centre

    Government of Alberta (Alberta Major Projects). Retrieved September 16, 2026

  7. eStruxture CAL-3 Data Centre

    Government of Alberta (Alberta Major Projects). Retrieved September 16, 2026

  8. CAL-3

    eStruxture Data Centers. Retrieved September 16, 2026

  9. Data centre development

    Sturgeon County. Retrieved September 16, 2026

  10. Saskatchewan Welcomes Historic Investment, New Jobs and Partnerships

    Government of Saskatchewan. Retrieved September 16, 2026

  11. Greenlight Electricity Centre

    Retrieved September 16, 2026

  12. Wages Construction Electrician in Alberta

    Job Bank (Employment and Social Development Canada). Retrieved September 16, 2026

  13. Wages Refrigeration and Air Conditioning Mechanic in Alberta

    Job Bank (Employment and Social Development Canada). Retrieved September 16, 2026

  14. Wages Construction Electrician in Saskatchewan

    Job Bank (Employment and Social Development Canada). Retrieved September 16, 2026

  15. Wages Refrigeration and Air Conditioning Mechanic in Saskatchewan

    Job Bank (Employment and Social Development Canada). Retrieved September 16, 2026

  16. Compulsory Certification Trades

    Government of Alberta (Tradesecrets). Retrieved September 16, 2026

  17. Large Load Projects

    Alberta Electric System Operator (AESO). Retrieved September 16, 2026

  18. Sturgeon County

    Retrieved September 16, 2026

  19. Alberta Utilities Commission

    Retrieved September 16, 2026

  20. Synapse Data Center Power Plant Project

    Alberta Utilities Commission. Retrieved September 16, 2026

  21. Record of EIA registrations and determinations 1657 - Most recent

    Government of New Brunswick (Department of Environment and Local Government). Retrieved September 16, 2026

  22. Highvale End Land Use Area Structure Plan

    TransAlta Corporation. Retrieved September 16, 2026

  23. Government of Canada and TELUS advance work to build sovereign AI infrastructure

    Innovation, Science and Economic Development Canada. Retrieved September 16, 2026

Join the waitlist for these projects

Your signup records your interest in these projects. Join the waitlist for access updates. You can leave the list at any time.

Yes, email me about Werko waitlist access and invitations. I can unsubscribe at any time.