Major projects
Major projects in Canada for trades workers
Updated September 18, 2026
For job postings, check the careers pages of the companies named on each page. These pages do not list job openings yet.
Check project status and learn about typical trades, then choose a project or guide below. These pages cover LNG, nuclear, mines, a port, a highway and a power line. The projects range from LNG Canada Phase 2, in Kitimat, on the traditional territory of the Haisla Nation to Northcliff Resources’ Sisson Mine, at Sisson Brook, New Brunswick.
Choose a guide
Pick the page that matches what you want to know.
LNG in B.C.: compare the Kitimat projects, trades, tickets and pay on the LNG and gas processing page.
Nuclear and uranium in Ontario and Saskatchewan: check status, site clearance, trades and pay.
Data centres: see which builds are under way, plus typical trades, tickets and pay.
One project: check its status, typical trades and who is behind it. Some pages also cover camps and construction plans.
Getting hired: learn how union halls, contractors and project employers hire you.
The Canada Investment Summit: see what it changed for trades work.
Where each project stands
| Project | Status |
|---|---|
| LNG Canada, in Kitimat, on the traditional territory of the Haisla Nation[4][1] | LNG Canada Phase 1 has been in production since summer 2025, and shipped its first LNG for export on June 30, 2025[4][1] |
| Cedar LNG, a floating LNG facility planned for Kitimat, within the traditional territory of the Haisla Nation[5] | Cedar LNG started construction right after its final investment decision on June 25, 2024[5][6] |
| LNG Canada Phase 2, in Kitimat, on the traditional territory of the Haisla Nation[1] | LNG Canada Phase 2 is working toward a possible final investment decision. The expansion was referred to the Major Projects Office on September 11, 2025. It would double production at LNG Canada’s facility (Phase 2 expansion)[1] |
| Ksi Lisims LNG, a proposed floating LNG export facility on Pearse Island[7] | Environmental assessment certificate issued September 15, 2025. LNG facility permit issued November 4, 2025[7] |
| Darlington New Nuclear Project, at the existing Darlington site in the Municipality of Clarington[3] | 1 unit of up to 4 planned units is under construction[3] |
| Bruce A and B Nuclear Generating Stations, in the municipality of Kincardine on the eastern shore of Lake Huron[8] | Units 1, 2, 3, 5, 6, 7 and 8, and not Unit 4, are operating[8] |
| North Coast Transmission Line, in northwestern British Columbia.[2] | Phase 1 construction is underway, according to B.C. The North Coast Transmission Line is a new power line in northwest B.C.[9][10][11] |
| Red Chris Mine Expansion, in northwestern British Columbia.[2] | Newmont has major regulatory approvals to expand the Red Chris copper and gold mine. The expansion would move mining underground using a method called block caving. Newmont had not made its final decision to invest as of July 2026[12][13][14] |
| Roberts Bank Terminal 2, in Delta, British Columbia.[2] | The project was still waiting for final permits on August 28, 2026, according to the Major Projects Office[15] |
| McIlvenna Bay Project, in east-central Saskatchewan.[2] | The McIlvenna Bay mine has started producing and is increasing output toward commercial production later in the third quarter of 2026[16] |
| Canada Nickel’s Crawford Project, in Timmins, Ontario.[2] | Canada Nickel has its federal impact assessment decision. It still needs detailed engineering, project financing, and the remaining provincial and federal permits before planned construction[17][18] |
| Northcliff Resources’ Sisson Mine, at Sisson Brook, New Brunswick.[2] | Northcliff has not decided to build Sisson yet; the project is still in the planning stage before construction[19] |
| Mackenzie Valley Highway, from Wrigley to Inuvik, Northwest Territories, on a route still being developed.[2] | The Mackenzie Valley Environmental Impact Review Board is updating what the environmental assessment covers. The change reflects changes proposed by the Government of the Northwest Territories. It announced the update in a notice dated September 5, 2026[20][21] |
What the summit changed
The federal government says the summit resulted in nearly $500 billion in new investment commitments to Canada. Commitments are not job openings. The summit page lists the projects the Major Projects Office is assessing and links to the ones Werko covers.
Sources22
Sources
- LNG Canada Phase 2
Privy Council Office, Major Projects Office. Retrieved September 15, 2026
- Projects referred to the MPO
Privy Council Office, Major Projects Office. Retrieved September 15, 2026
- Darlington New Nuclear Project
Canadian Nuclear Safety Commission. Retrieved September 15, 2026
- LNG Canada
BC Energy Regulator. Retrieved September 15, 2026
- Cedar LNG
BC Energy Regulator. Retrieved September 15, 2026
- Construction
Cedar LNG. Retrieved September 15, 2026
- Ksi Lisims LNG
BC Energy Regulator. Retrieved September 15, 2026
- Bruce A and B Nuclear Generating Stations
Canadian Nuclear Safety Commission. Retrieved September 15, 2026
- North Coast Transmission Line breaking ground to power economic growth
Government of British Columbia, BC Gov News. Retrieved September 15, 2026
- North Coast Transmission Line Phase 1: Prince George to Glenannan Transmission
BC Hydro. Retrieved September 15, 2026
- North Coast Transmission Line
Privy Council Office, Major Projects Office. Retrieved September 15, 2026
- Second Quarter 2026 Results
Newmont Corporation. Retrieved September 15, 2026
- Minister approves Red Chris mine block-cave amendment
Government of British Columbia (Ministry of Environment and Parks). Retrieved September 15, 2026
- B.C. approves Red Chris mine expansion
Government of British Columbia (Office of the Premier; Ministry of Mining and Critical Minerals). Retrieved September 15, 2026
- Roberts Bank Terminal 2 (RBT2)
Major Projects Office, Privy Council Office, Government of Canada. Retrieved September 15, 2026
- Eldorado Gold Reports Solid Q2 2026 Financial and Operational Results; Skouries On Track for Q3 2026
Eldorado Gold Corporation. Retrieved September 15, 2026
- Canada Nickel Secures Federal Approval for Crawford Nickel Project
Canada Nickel Company. Retrieved September 15, 2026
- The federal government announces major milestone for the Crawford Nickel Project
Impact Assessment Agency of Canada. Retrieved September 15, 2026
- Northcliff Announces Results of Feasibility Study Update for Sisson Project
Northcliff Resources Ltd. (news release distributed by Cision Canada Newswire). Retrieved September 15, 2026
- Notice of Proceeding: Online Review on the scope of the Mackenzie Valley environmental assessment
Mackenzie Valley Environmental Impact Review Board. Retrieved September 15, 2026
- Notice of Proceeding: Re-scoping session dates and revised draft workplan
Mackenzie Valley Environmental Impact Review Board. Retrieved September 15, 2026
- The first Canada Investment Summit unleashes nearly $500 billion of new investment in Canada
Prime Minister of Canada. Retrieved September 15, 2026
Related pages
- LNG projects in B.C.: status, trades and pay
- Nuclear and uranium work in Ontario and Saskatchewan: projects, clearance and pay
- Data centre construction in Canada: projects, trades and pay
- Darlington New Nuclear: trades, pay and site clearance
- Ksi Lisims LNG: when work could start, trades and pay
- Canada Investment Summit 2026: a guide for trades
- North Coast Transmission Line: camps, trades, pay
- Red Chris Mine expansion: status, trades and camp
- Roberts Bank Terminal 2: timing, trades and pay
- McIlvenna Bay mine: status, trades and pay
- Crawford Nickel Project: status, trades and pay
- Sisson Mine in New Brunswick: status and trades
- Mackenzie Valley Highway: status, trades and camps
- LNG Canada Phase 2, Kitimat: status, trades and pay
- How to get hired on a major project in Canada
- How Werko checks facts